Adelaide Airport Expansion
$2M
BESIX Watpac
Ongoing
Controlled demolition and site clearance works completed under approved airside safety and operational protocols.
Multi-stage demolition within a live airport environment
Project Scope:
Undertake all demolition works in accordance with the approved project scope and technical requirements.
PSU Stage 2AI
- Demolish existing internal and structural elements as required under the project scope
- Remove redundant building materials and fixtures to prepare areas for redevelopment
- Waste transportation carried out in compliance with airside movement and disposal protocols
- Waste management including segregation, recycling and certified disposal of all materials
- Housekeeping maintained throughout to ensure safe and compliant work zones
- Floor grinding completed to achieve smooth, clean sub-structure finishes for subsequent construction phases
BSU Stage 3/4
- Removal of floor coverings and lightweight wall partitions
- Ceiling removal and floor grinding to expose sub-structure
- Waste segregation, transportation and disposal in accordance with airport environmental standards
- Housekeeping and daily site maintenance under airside controls
- Coordination with airport operations to ensure uninterrupted terminal activity