Burnside Village Shopping Centre

$2M Hansen Yuncken 2023-2025

Demolition and asbestos removal works completed under approved safety and risk management protocols.

Multi-stage demolition project.
Completion 2025

Project Scope:

Undertake demolition and asbestos works in line with identified drawings, documents, and addendums with the following outcomes:

  • Complete a full and comprehensive risk assessment and safety analysis, with approvals obtained from authorities prior to commencement.
  • Demolish concrete walls, piles, and cut wall starter bars to connect the new B1 carpark.
  • Demolish and remove existing tenancies, tenancy shopfronts, shopfittings, intertenancy walls, partitions, bulkheads, structural framing, floor finishes, ceiling linings, joinery, timber floors, internal stairs, bollards, bicycle hoops, and site furniture.
  • Remove façades, glazed shopfronts, cladding, signage boxes, decks, paving, kerbing, asphalt, wall fixtures, lighting, and associated structural steelwork.
  • Demolish and remove canopies, verandas, downpipes, gutters, and drainage.
  • Decommission and remove goods lifts, stair and lift shafts, including associated wall linings and topping slabs.
  • Demolish suspended carpark slab, planters, planter boxes including soil and trees/plants, and associated works.

Tenancy works:
  • Demolish and remove bulkheads, ceilings, and lightweight walls.
  • Demolish existing floor finishes as indicated.
  • Remove and dispose of the existing aluminium glazed shopfront.
  • Conduct all works outside standard business hours as required.
Our Projects

Other Projects

We’ve supported some of South Australia’s most complex and high-profile construction sites. From airside demolitions to heritage-sensitive environments, our work speaks for itself.

$1M Hansen Yuncken 2024

Coopers Stadium Upgrade

Targeted demolition and removal works safely delivered under approved risk and stadium operational protocols.

Learn More
$1.2m Hansen Yuncken 2021

Bice Building Refurbishment – Lot Fourteen 

Detailed demolition works completed within a heritage-listed building under strict preservation and safety controls.

Learn More
$3.3M Hansen Yuncken 2023

SkyCity Casino Redevelopment

Controlled demolition and site clearance works completed under strict safety and environmental management protocols.

Learn More
$2M BESIX Watpac Ongoing

Adelaide Airport Expansion

Controlled demolition and site clearance works completed under approved airside safety and operational protocols.

Learn More