Bice Building Refurbishment – Lot Fourteen 

$1.2m Hansen Yuncken 2021

Detailed demolition works completed within a heritage-listed building under strict preservation and safety controls.

Comprehensive internal and structural demolition within the Lot Fourteen innovation precinct 

Project Scope:

Provide detailed demolition to all levels and roof space of the heritage-listed Bice Building, achieving the following outcomes: 

  • Demolition of concrete floors across multiple levels to facilitate seismic restraint installation, with engineered propping implemented to maintain structural stability throughout 
  • Precision demolition to external façades and balconies, ensuring the protection and preservation of original heritage surfaces and architectural details 
  • Removal and disposal of high-level roof shingles containing asbestos, undertaken under licensed environmental and safety management protocols 
  • Internal wall demolition to enable new service installations and compliant openings, supported by engineered temporary works as required 
Our Projects

Other Projects

We’ve supported some of South Australia’s most complex and high-profile construction sites. From airside demolitions to heritage-sensitive environments, our work speaks for itself.

$1M Hansen Yuncken 2024

Coopers Stadium Upgrade

Targeted demolition and removal works safely delivered under approved risk and stadium operational protocols.

Learn More
$2M Hansen Yuncken 2023-2025

Burnside Village Shopping Centre

Demolition and asbestos removal works completed under approved safety and risk management protocols.

Learn More
$3.3M Hansen Yuncken 2023

SkyCity Casino Redevelopment

Controlled demolition and site clearance works completed under strict safety and environmental management protocols.

Learn More
$2M BESIX Watpac Ongoing

Adelaide Airport Expansion

Controlled demolition and site clearance works completed under approved airside safety and operational protocols.

Learn More