Back to Projects
Bice Building Refurbishment – Lot Fourteen
$1.2m
Hansen Yuncken
2021
Detailed demolition works completed within a heritage-listed building under strict preservation and safety controls.
Comprehensive internal and structural demolition within the Lot Fourteen innovation precinct
Project Scope:
Provide detailed demolition to all levels and roof space of the heritage-listed Bice Building, achieving the following outcomes:
- Demolition of concrete floors across multiple levels to facilitate seismic restraint installation, with engineered propping implemented to maintain structural stability throughout
- Precision demolition to external façades and balconies, ensuring the protection and preservation of original heritage surfaces and architectural details
- Removal and disposal of high-level roof shingles containing asbestos, undertaken under licensed environmental and safety management protocols
- Internal wall demolition to enable new service installations and compliant openings, supported by engineered temporary works as required


