Multi-stage demolition project.
Burnside Village Shopping Centre
$2M
Hansen Yuncken
2023-2025
Demolition and asbestos removal works completed under approved safety and risk management protocols.
Multi-stage demolition project.
Completion 2025
Project Scope:
Undertake demolition and asbestos works in line with identified drawings, documents, and addendums with the following outcomes:
- Complete a full and comprehensive risk assessment and safety analysis, with approvals obtained from authorities prior to commencement.
- Demolish concrete walls, piles, and cut wall starter bars to connect the new B1 carpark.
- Demolish and remove existing tenancies, tenancy shopfronts, shopfittings, intertenancy walls, partitions, bulkheads, structural framing, floor finishes, ceiling linings, joinery, timber floors, internal stairs, bollards, bicycle hoops, and site furniture.
- Remove façades, glazed shopfronts, cladding, signage boxes, decks, paving, kerbing, asphalt, wall fixtures, lighting, and associated structural steelwork.
- Demolish and remove canopies, verandas, downpipes, gutters, and drainage.
- Decommission and remove goods lifts, stair and lift shafts, including associated wall linings and topping slabs.
- Demolish suspended carpark slab, planters, planter boxes including soil and trees/plants, and associated works.
Tenancy works:
- Demolish and remove bulkheads, ceilings, and lightweight walls.
- Demolish existing floor finishes as indicated.
- Remove and dispose of the existing aluminium glazed shopfront.